1.4 Questionnaires
The main parameters mentioned under sections 2.1 to 2.3 are obtained by means of
questionnaires 1 and 2. These data form the basis for the calculation plus simulation of an enercret installation.
2. Planning Phases
2.1 Preliminary Studies
It is possible to assess whether an enercret installation is technically feasible and economically viable for a specific building.
As a rule it can be said that in the case of a building with deep, ground-contact concrete structures (piled foundation, diaphragm wall or piled retaining wall for the construction pit) and a cooling requirement the use of an enercret installation is always technically feasible and will be cost-effective.
In many cases the enercret installation will suffice to satisfy the energy requirements - this will largely depend on the ratio of the size of the foundations to the size of the building.
The ground conditions and the specific energy requirements of the building must also be considered in the assessment.
Even before the preliminary studies, the overall HVAC concept for the building must be considered, bearing in mind that the enercret system is used both for heating and cooling (geothermal balance in the ground) and that the energy is introduced into the building via a low-temperature heating system which is also suitable for cooling.
The output values given below can be used to obtain a rough estimate of the energy capacity of an enercret installation:
Absorber pile, 40 - 60 W/linear
30 -
Absorber pile,
Diaphragm wall, piled 30 W/m² rigged
retaining wall surface area
Ground slab 15 - 30 W/m² rigged
surface area (depending
on insulation)
Output per linear metre 2 - 8 W/m
of piping
Assumptions Damp soil or still
groundwater, normal
periods of use, soil types
with good thermal capacity,
standard pipe
spacing, min. soil depth
The above values must be corrected downwards
in the case of:
• Dry soil, soil with low thermal conductivity
and capacity
• Prolonged periods of use
• Single application (heating or cooling)
• External factors influencing ground temperature
The above values must be corrected upwards
in the case of:
• Groundwater flow
In the case of a heating application, the capacity for the building will increase, depending
on the performance ratings, by the drive power of the heat pump.
The period of use for “direct cooling” is limited if there is no groundwater flow as the
absorption/heat transfer medium will no longer be adequately cooled once a ground
temperature of
The system can be operated with a refrigerator unit (reversible heat pump), while it must be
borne in mind that the heat produced by the drive power must be dissipated in the
ground.
The following ballpark figures can be used to obtain a rough estimate of the costeffectiveness
of the investment.
Investment costs:
Absorber piles, diaphragm walls
(standard design) approx. € 460.--/kW
installed capacity
Ground slabs approx. € 560.--/ kW
installed capacity
Operating costs:
(based on electricity charge: 7 cent/kW)
“Direct cooling”: virtually nil
Heating with geo- approx. 2 cent/kW
thermal heat pump:
Cooling with refrigerator unit or reversible
geothermal heat pump: approx. 2 cent/kW
2.2 Design
Once the preliminary studies show that cooling/ heating a building with energy extracted by means of an enercret system is a viable proposition, the detailed engineering work can begin.
The first step is to plan the layout of the circuits in the foundation structures, which will usually be HDPE piping DN 20/2.0 and/or 25/
The pipe spacing is derived from the calculation of energy use and is usually between
As a rule, a pipe circuit (water circuit) will have a length of
The flow rate of the heat transfer medium should be between 0.2 and max.
When planning the building it must be borne in mind that it should be possible to protect the connecting lines from the foundation structures during subsequent work in the construction pit and for these lines to be properly connected.
The type of pipe connectors used are usually thermofusion connectors.
The connecting lines from the individual water circuits in the foundation structures up to the manifold block are laid in the layer of compressed concrete below the ground slab and run along the outer wall of the building.
It may be necessary to provide watertight openings in the ground slab for design reasons.
The pipes must be suitably cushioned in areas where they might be exposed to edge pressure or shear forces (for example at structural joints).
The manifold block must be located in the technical services room or on the outer wall of the room in an accessible shaft above groundwater level. It must be possible to calibrate flow rates in the individual circuits by means of fine adjustment valves.
The flow and return lines lead from the manifold block to the control centre.
It is often necessary to include intermediate manifolds and/or ring circuits based on the
Tichelmann system.
This will largely depend on the size and shape of the building.
2.3 Installation Planning
When planning the installation, the exact piping layout drawings for the structures must be determined along with details of connection to the connecting lines. Pipe connections in the area of the pile head must be planned to ensure minimal interference with the building contractor.
If possible the connecting lines to the manifold block should be laid by the shortest route, in parallel, with adequate spacing and without crossing.
They must then be suitably lined up before the manifold block so that they can then be directly connected up to it.
The concrete pouring stages must be clarified with the building contractor and taken into account in the planning in order to avoid unnecessary spigot and socket joints.
Any settlement areas must be checked with the structural engineer and crossing such zones is to be avoided.
In individual cases it will also be necessary to consider different longitudinal expansion due to the setting temperature of the concrete.
In addition, the structural engineer must stipulate any taboo zones for the pipe laying.
The location of the manifold block must be selected to allow easy access as well as easy operation and monitoring of the regulating valves.
All components must be checked to ensure that they are frost-proof.
As a rule, expansion chambers and bleed valves are to be incorporated after the manifold block.
The required openings in foundation beams, walls, ceilings and joists for absorber, collecting or ring pipes must be taken into account in the construction planning and the structural design.
3. Calculation and Simulation
On the basis of the information provided in
Questionnaires 1 and 2, plus the supplementary
data from the proposed design, the enercret
installation can then be calculated with
the specially developed
TRNSPILE/TRNSSLAB software.
The main data to be entered are the geometry, size and number of foundations and the spacing of the absorber pipes.
Other important parameters include information on the subsoil such as moisture content, groundwater table plus approximate flow velocity and the temperature of the subsoil.
To calculate coverage of the building’s load profile for heating and/or cooling operations, the monthly and weekly
distribution of heating and/or cooling energy requirements as well as the heating and/or cooling peak demand must be stated.
The program uses the data on the thermal conductivity and storage capacity of the soil layers and the respective climatic data stored in its databases to compute the geothermal energy potential present in the ground for heating and cooling purposes. It also calculates and visualizes the percentage of heating and cooling requirements covered on a monthly basis plus peak heating and cooling demand. The temperature fields in the area of the foundations can be checked at any point in time during the heating or cooling period.
Clearly, it is essential to use the appropriate software when calculating an enercret installation since there are a series of parameters which mutually influence one another within the three-dimensional volume of ground and ultimately determine the capacity limits of the system. In the area of the foundations, for example, it is vital to avoid frost which might jeopardize their structural integrity.
The software makes it possible to select the most cost-effective use of the geothermal energy present in the ground to suit the energy requirement profile of the building.
The effects of energy flows from an enercret installation in the building can be reproduced through interfaces with the building simulation software
TRNSYS.
nägele
energie- und haustechnik gmbH
Nägele Energie- und Haustechnik GmbH
Bundesstraße 24
A-6832 Sulz/Röthis
Tel. 0043/5522/3627-404
Fax 0043/5522/3627-400
email: info@enercret.com
Homepage: www.enercret.com